UBC Beaty Biodiversity Centre Addition
UBC Beaty Biodiversity Centre Addition
UBC Beaty Biodiversity Centre Addition
UBC Beaty Biodiversity Centre Addition
UBC Beaty Biodiversity Centre Addition
UBC Beaty Biodiversity Centre Addition
UBC Beaty Biodiversity Centre Addition
UBC Beaty Biodiversity Centre Addition
UBC Beaty Biodiversity Centre Addition
UBC Beaty Biodiversity Centre Addition

UBC Beaty Biodiversity Centre Addition

An addition to UBC’s Beaty Biodiversity Centre along Main Mall, extending the biodiversity precinct with below-grade collection space and new Conservation Science labs.

ClientUniversity of British Columbia

Project Type

Education

StatusCompleted

Dates2025

Services

Size4,249 SM / 45,737 SF

SustainabilityDesigned to LEED Gold

Project Description

Situated along UBC’s iconic Main Mall, the addition to the Beaty Biodiversity Centre is a study in architectural continuity and research evolution. The project expands the “biodiversity precinct,” utilizing the campus’s signature bar-building typology to define and frame exterior courtyards. While the upper floors provide critical infrastructure for the new Conservation Science Initiative, the below-grade expansion doubles down on the museum’s mission, creating contiguous space for the world-class collections. The design received unanimous support from the UBC Urban Design Panel.

Have a project in mind? We'd love to hear about it.

WORK WITH US